Fresh from the team

The Qualis Blog

Manufacturing insights, product updates and practical guides.

Latest articles

Engineering Change Order Process for BOMs: Change the Design Without Breaking Production
engineering change order processengineering change order

Engineering Change Order Process for BOMs: Change the Design Without Breaking Production

How an engineering change order process inside your ERP takes a bill of material from a released revision to the next one: fork a draft, see the side-by-side diff, measure the impact on open orders and stock, decide what happens to stranded parts, approve, and apply on approval or on a scheduled date, while orders already on the floor keep the revision they started with.

13 min read
Shop Floor Data Collection: Stop Guessing What the Job Actually Cost
shop floor data collection softwareshop floor data collection

Shop Floor Data Collection: Stop Guessing What the Job Actually Cost

Paper travelers tell you what happened, days after it happened. Shop floor data collection captures labor time, good and scrap quantity, and material issue at the bench, as the work happens. Here is how the Qualis operator cockpit works: pick your work center once, one-tap start and pause on your own clock, mandatory scrap reasons, and a quality control point that caps what the next operation can report.

16 min read
Work Center Capacity Planning: See the Overloaded Week Before You Promise the Date
work center capacity planningwork center load report

Work Center Capacity Planning: See the Overloaded Week Before You Promise the Date

Sales needs an answer before the call ends, and "we're slammed" is not one. Work center capacity planning turns your shift patterns and routings into two numbers per work center per week: hours already booked, and hours you actually have. Here is how the Qualis load board builds them, why queue time and outside processing must not count against a cell, and how the market handles capacity today.

14 min read